Critical Path Construction Miami, Florida Critical Path Construction Miami, Florida

Drop us a line...

Send Message

Current

April Update

Stanton Marriot Renovation Complete Critical Path played a key role in the multi-million dollar restoration of the Stanton Marriott Hotel on South Beach.  Working as the prime structural contractor we displayed our skill set with historic buildings as we successfully demolished and rebuilt the structure of the historic Stanton Hotel from the inside out. We…

read more
Cutler Bay Gateway

Pre-construction work has started on this 7,000 sq/ft retail center at 20001 South Dixie Highway, Cutler Bay, Florida, scheduled to open 2017. For pre-leasing info please check out this PDF fromCREC. Critical Path is handling turn-key development and construction on this project – and offers these services for clients by request.

read more
80NE40, Design District

Critical Path will be breaking ground soon on this stunning Design District project at 80 NE 40th St, Miami. The design by MKDA will surely stand out and complement the amazing development happening all over the area. We’ll be meeting the challenges for quality, timing, safety and cost on this project – as we always do.…

read more
Lynmar Hotel Completed

Critical Path just wrapped up total restoration of two historic South Beach properties: The Lynmar Hotel and it’s neighbor The London Arms. We restored both of these landmark structures with a complete interior structural rebuild and stabilized and refinished the classic facades on both buildings. The Lynmar first floor has been leased to Charming Charlies and…

read more
First Quarter 2016 Update

We’re proud of the work we do and the people we do it with. Here’s the latest from Critical Path. If you have a project you’d like to talk about with us don’t hesitate – give us a call at (305)-856-3919. Critical Path just wrapped up total restoration of two historic South Beach properties: The…

read more